Best track · NOEL (2001) HURDAT2 · 12 fixes · AL
Wind intensity · 6-hourly fixes over the storm's life
TD TS C1 C2 C3 C4 C5
Atlas · Named storm · AL
NOEL (2001)
Strengthened across its track. Peaked as category 1 at 65 kt before making final fix.
Peak winds65 kt
Peak categoryCategory 1
Track duration~3 days
Fixes12
Life cycle
Formed as
TS
45 kt at 33.9°, -50.4°
→
Peaked as
C1
65 kt at fix 7 of 12
→
Ended as
TS
50 kt at 45.0°, -48.0°