Best track · LENNY (1999) HURDAT2 · 27 fixes · AL
Wind intensity · 6-hourly fixes over the storm's life
TD TS C1 C2 C3 C4 C5
Atlas · Named storm · AL
LENNY (1999)
Strengthened across its track. Peaked as category 4 at 135 kt before weakening out.
Peak winds135 kt
Peak categoryCategory 4
Track duration~6.8 days
Fixes27
Life cycle
Formed as
TS
40 kt at 16.4°, -79.9°
→
Peaked as
C4
135 kt at fix 14 of 27
→
Ended as
TS
40 kt at 16.0°, -59.0°